Preps for Jon’s Arrival

I’ve started prepping for Jon’s arrival (July 2nd +/-).

We’ve pulled the trailer out of the (garage/Storage unit/C-Cans.

AT disconnecting the roof compressor

First, we had to disconnect the mini-split unit, bleed down the compressor, and disconnect the components on the roof. Then we pulled the trailer out a couple of feet to disconnect the skirting around the back of the trailer and carefully pull it out.

Trailer out baking in the sun.
Need to clean out for Jon.

At the family meeting last Saturday Jon asked me to take some pictures of the power pole behind the trailers. I went out to do that on Sunday and discovered the problem below.

Before mowing

The wet, wet spring we are having has resulted in a burst of growth of the undergrowth. Need to get the weed-eater out.

A couple of hours later the results are shown below.

After photo

What follows are close ups of various pieces.

Close up

Below is the PVC pipe emerging from the ground and entering the box below the Meter. Appears to be 3 inch PVC.

Input piping, 3 inch PVC
Meter
Inside breaker box Left of the Meter.
Output of breaker box that runs to back of C-Cans