Things are starting to come together. The first batch of materials was delivered this morning. (Sorry it’s a 2 second video)
It got dumped off the truck and we had to immediately cover it to avoid it getting rained on. Bare wood wasn’t the problem, but a lot of chipboard and engineered beams don’t like to be rained on.
Shortly after the delivery, the backhoe showed up to excavate the septic system.
The drain line will emerge under the front door and run to the septic tank off the garage.
Note the septic tank waiting patiently on the trailer.
Digging the actual septic tank. Note the covered pile of construction materials in the background.