A quick review of the completion of the front deck.
First is the completion of the ramp along side the west side of the front of the house. We moved the ramp from along side of the trailer down to the house. The ramp turned out to be much lower slope than when servicing the trailer.
This is the first of two sections of the front desk railing. It was rediculously expensive pre-fab sections but does look very nice when completed.
This is the finished front ramp and deck. The ramp railings are slightly different and designed for stairs and slopes. There is a slight gap (about 1 ft) between the sections that I’m still noodling on.
This is looking Westward, up the stairs and down the ramp.
Close up of the solar lights on the deck posts. They are only
One reply on “Front Deck Finished”
I am sure I can come up with a solution for that gap, add it to my to do list.