Categories
house construction

I’m Baaaaaack

When I was last here it was early April in the middle of the snowstorms. It is now mid-May and the weather couldn’t be different. It is now upper seventies – low eighties and spring has definitely sprung. Last month, after the Snowpacolypse, we moved the Starlink antenna up to the roof.

Putting Starlink on roof.

After we moved the antenna, we started working on the Front Deck. I had long planned on an expansive front deck, on the north side of the house to be shaded during hot weather. I had planned to move the ramp from the trailer to run along the font of the house for easy access.

Front Deck Underpinning

Above is the underpinning of the deck. The white PVC pipes are clean outs for the plumbing drains. The next picture shows the cement pad for the NE stairs

Cement pad for the stairs
Note colors are misleading

The above shows the stairs on the NE side of the porch. Note that the steps and the deck are the same colors, just a difference in reflectivity.

Front Deck showing ramp

The white ramp is painted to protect the strand board. It will be covered with planking running crosswise.

Last week I saw a turtle climbing up the slope from the pond between my house and Jills. According to AT it wasn’t a snapping turtle (shape of jaw is different).

Turtle

The turtle was very skittish and so rather than perching it on a fencepost, I herded it back towards the pond.

One reply on “I’m Baaaaaack”

Leave a Reply

Your email address will not be published. Required fields are marked *