It’s been windy over the past week, so finishing the outside paneling is on hold. So AT & Johnny have been working inside.
I think it looks good, it’s primarily a tan color with light brown overtones.
In the bathroom, they have started installing the shower. So far they’ve gotten the sides and back installed.
Once the glue/caulking dry they will put the railings up and install the semi-circular doors.
Amplifying info to follow.