I’ve got another update on Jill’s house. It’s a couple of weeks later. Progress has been slower than Jill & AT would have liked, but most of the difficulties have been worked out progress is back on track.
The cabinets have been all set, in place and fixed to the walls, and the window trim molding is in place.
The gas powered, flow through Water Heater has been installed. It is the same one that I have installed and seems to work just fine.
The yellow piping is the propane input the clear plastic piping is the hot & cold water lines.
We’re on the second day of calm, almost not wind and the major focus of today is continuing work on the siding.
The goal for today is to try to get as much of the siding as possible up before the winds start up this afternoon.
The siding is precut with 2 pieces (one for each side) stepping up in 6 inch increments. Once the sides are on working on the South wall (with all the windows, and doors, and the support beams) will begin.
This is about 3:00 pm, and the winds are picking up. I think we will be shutting down for the day shortly.