Construction Begins

Just before Memorial Day, we have started construction.

First the engineered beams spanning the crawl space
The main beams are cut to fit and prepositioned.
Beams are positioned

Finally, the header boards are erected, and main beams are checked for being vertical and nailed in place.

Waiting for subfloor decking.

Friday afternoon came and AT and his son Cooper and I traveled about an hour and a half south to the Shirley Mountains, at the Prior Flats campground.

The Shirley Mountains are due South from the campground.

We drove to the mountains and I took some pictures.

Open Range. Other than Interstates and major roads, which are fenced; secondary roads run through open range, which cows and antelopes have right of way.
More Open Range: Why Did the Cows Cross the Road?
Occasional dead trees are result of Pine Beetles.
Note the dike of rock behind the dead tree on the right.,
Looking North from the top. Note the remains of snow in the foreground; left over from the snow we got a couple of weeks ago,.
Fire is a concern all across the West. Nice fire rings in the campgrounds.

Lots of things coming up next week. I should be closing on Tuesday Morning, which should free up construction funding. We will be putting down first floor decking, which will let us lay out actual floorplan rather than the nominal one in the plans. Will rent the backhoe for a month to move the septic tank and do initial landscape work. Etc, etc, etc.

When we left Friday, the weather app on the iPhone showed clear weather for the next week. We had occasional rain showers up in the Shirley’s but it wasn’t noticeable except for Sunday morning. As we were driving back Monday morning it rained off and on all the way back, with the rain becoming a steady downpour as we got into town. By the looks of it Casper received 2-3 inches over the past couple of days.

When I got back, the cat had survived nicely (I had left him 3 cans of food, as well as the timed feeder). In fact, the below picture shows the leftover dry cat food.

Cat Fud!

Given the heavy overcast limiting Solar Power, I went out back to switch power back to Rocky Mountain Power I discovered a minor disaster./

Oops.

Note the damage to the 2×12’s from the beefy lag screws. We had moved the support platform out from the C-Can to avoid damage to the outlet pictured above, and I think that removed some of the strength.

Categories
Uncategorized

Two More Steps Forward and One Back

More of Septic Tank installation.

Jib Tree Truck

We got a jib truck to lift the septic tank and lower it into the hole.

Lifting Septic Tank

First step is to hoist the tank up and clear of the trailer.

Backing up to hole.

The next step is to back up to the already excavated hole.

Septic Tank being lowered.

The tank is now lowered into the hole.

Final resting place.

This happened on Saturday May 21. Now, if you look carefully it seems to be slightly raised on the right-hand end. It turns out that the plumber stopped by on Sunday. They set up the transit level and it turns out that the offset is 5 inches which is too much.

Also, the tank needs to be moved to the right about 3-6 feet, to allow 22.5-degree angles to turn the corner from the entry from the house into the tank. The bottom line is that we will need to rent a backhoe to re-dig the hole to enlarge it to the right and move it to the right.

As the title says, Two steps forward, one step back.

Categories
Uncategorized

Gathering Materials

Things are starting to come together. The first batch of materials was delivered this morning. (Sorry it’s a 2 second video)

It got dumped off the truck and we had to immediately cover it to avoid it getting rained on. Bare wood wasn’t the problem, but a lot of chipboard and engineered beams don’t like to be rained on.

Shortly after the delivery, the backhoe showed up to excavate the septic system.

Septic tank outline.

The drain line will emerge under the front door and run to the septic tank off the garage.

Drain line emerging from under front door. Septic tank will be under the front loader scoop.

Note the septic tank waiting patiently on the trailer.

Digging the septic tank itself.

Digging the actual septic tank. Note the covered pile of construction materials in the background.

Categories
Uncategorized

Wind is Alive!

At the end of April, I erected the windmill and it was a failure. I discovered that it appeared to be shorted. I got an RMA (returned material authorization) and sent it back to the factory. I also discovered that I had ordered the wrong Control Box (12V versus 48V). I ordered the correct one. The windmill itself was troubleshot and they discovered a shorted capacitor in the powerhead. I called and talked to them and deduced that the Control Box was the cause. It was fixed under warranty, and shipped back and arrived today.

Re-erected

I took great care to ensure that the wiring was correct end to end; but with only 3 wires (Plus, Minus, and Ground) it wasn’t that hard. When it was erected, is commenced spinning and was producing power.

One thing is that the windmill is small, only 1 square-meter of swept area and is rated at 40KWh/month. My recent electric usage was 2500-3000 KWh or roughly 20%. But the advantage is that is runs all night; while the Solar Panels stop after sunset.

From the orchard, looking East at the foundation.

You can see the rain/hail showers blowing through. The next photo is a widespread view to the NE.

Line of rain/hail showers stretching out to the NE

I will monitor the windmill output over the next few days.

Categories
Uncategorized

Foundation Done

Well, the foundation is done, and you can get a better feel for the layout now.

Foundation is done

This is from the same position as some of the other views. The hillside is cut away much further than before.

Layout with the lake view.

Across the back of the house (L-R) is the back bedroom, the kitchen and the master bedroom, all overlooking the lake/pond.

Outside the front door.

This is the view from the front door, looking through the Living Room and Kitchen out over the lake. The backhoe is parked in the garage.

Finally, the last view is a panorama, with the sun getting ready to set behind the barn and trailer.

Panorama view

I’m not sure how much you can blow this up. Below is the same picture at a much higher density

Bigger Panorama View

I’ll post the time-lapse photos to the Dropbox account later.

UPDATE – It looks like the program trims both large and small photos when uploaded.

Categories
Uncategorized

It’s Alive!

I discovered something new, that occurred in the past 1 or 2 days. The apple trees (and possibly the pear trees) have sprouted leaves, and hence survived the winter.

The trees are sprouting, all this growth over one or two days.

The other six apple trees are showing leaves to a greater of lesser extent. The two pear trees are showing buds, but haven’t sprouted leaves yet.

Categories
Uncategorized

Footings and Foundation Walls

Once the footings were poured and dried for a day it came time to put the rebar in and to frame the foundation walls. The below series shows the sequence of construction on 5 April 2020.

Pictured about 6:00am. The rebar is wired in place and all of the temporary wall panels are laid out ready to put up. Note my shadow.
4 hours later most of the panels are up and braced.
The cement pumping truck has arrived.
First of 3 cement trucks has arrived and beginning of pour.
Moving around perimeter. Wade, the owner, is in yellow doing the pour. The two men following are managing the agitator to release bubbles and the final man is smoothing the top of the wall.
Two days later with the portable side walls back on the truck. The top of the footing wall will be close to the ground level when the dirt is filled back in around the outside.

In other good news, I have been off the wired grid for about 36 hours. Now the weather has been optimum, clear and mostly cloudless during the day, but I discovered the secret is to shut down the trailer breaker after sunset to go on the trailer batteries. After the sun comes back up, about 8:30-9:00AM, I can power the trailer back up and use PV cells to recharge the main batteries and trailer battery. I may need another 48V main battery to get through prolonged cloudy weather/winter gloom, but things are looking hopeful.

Categories
Uncategorized

Taters & Footings

I finally got my potatoes planted. I have tried a variety of planting methods to see how they will fare.

The first method is using 5-gallon buckets. I had tried something similar using large pots on my deck in Portland and have reviewed numerous You Tube videos like HERE or HERE. Below is the process I used.

Step 1 – Drill a few holes in the bottom of the bucket

The first step is to drill holes in the bucket to ensure drainage. If the potatoes sit in prolonged damp they will rot.

Straw in the bucket – not to mend the bucket but to ensure drainage.

Since I have a large amount of straw available (bales and bales by the house) I put some in the bottom of the bucket to enhance the drainage. For those of us of a certain age, holes in the bucket and straw bring to mind a song.

Mixed of potting soil, manure, and some sandy soil

I put some potting soil, manure, and sandy soil in the buckets and and put the seed potato chunks in and filled in more soil. In addition to the buckets, I also planted some of the pieces in traditional rows so I could get a good comparison with bucket grown potatoes.

Buckets, 2 each of Caribou Russet, Yukon Gold and Keuka Gold
Row Method, one row each of the three varieties

On a completely unrelated topic they are pouring the footings for the walls today, Note, that these are 4 feet below the grade level to ensure they are below the frost line. I have labelled the pictures below so you can relate the pictures of footings to the floor plan. Note that there are some changes to the floor plan; the garage is rotated 90 degrees to make access easier, and we’ve simplified the roof-line on the bedroom end.

Forms looking East
Forms looking West
Footings complete.

Categories
Uncategorized

House Construction

We have broken ground on my new house! The date of first dirt moved is 28 April 2022.

Breaking ground on the house.

As you can see, to put the house where I wanted it, we have to dig out a piece of one hill. Also since the footings need to be about 4 feet down to be below the frostline, they will be moving a lot of dirt.

More dirt moved; view from the Orchard
More dirt moved.

Expecting concrete footings to be poured next week.